# What should a Renovation and Fit-Out Agreement include under Thai law?

> Practical notes on the Renovation and Fit-Out Agreement under Thai law: Before work starts; Payments and receipts; Stamp duty; During the Works; Acceptance and delay damages; Defects; and Signing and disputes.

Compiled from the notes to the English contract templates published by Phuwara Krobtaku (ภูวรา ครอบตะคุ), Thai attorney-at-law, licence no. 477/2558. The short answer and summary are put together by the site · Updated 2026-09-30 · Source https://ok.aipdpa.com/kb/renovation-and-fit-out-agreement-thailand

## Short answer

The Renovation and Fit-Out Agreement on this site is an English-language document drafted for use under Thai law. Its 26 clauses cover Definitions and Interpretation; Scope of the Works; Existing Conditions and Hidden Conditions; Permits, Structure and Building Rules; Materials and Finishes; Programme, Access and Working on Site; Extension of Time; Variations; and 18 more. The notes below explain Before work starts; Payments and receipts; and Stamp duty.

## Key facts

- **Clauses in the template:** 26
- **Stamp duty:** This Agreement is a hire of work contract. Stamp duty is 1 THB for every 1,000 THB or part of 1,000 THB of the Contract Price. On the Contract Price you entered, the duty on the original is the amount the system calculates from the figures entered, and each counterpart carries the amount the system calculates from the figures entered. The Contractor pays the duty (Clause 11.9) within 15 days after signing. If the Contract Price is 1,000,000 THB or more, the duty must be paid in money to the Revenue Department rather than by stamps, and an electronically signed agreement uses the e-Stamp Duty system. An unstamped agreement cannot be used as evidence in a Thai civil court until the duty and a surcharge are paid. Variations that increase the price attract additional duty.
- **Language of the form:** English
- **Price of the form on this site:** 990 THB

## What the template covers

1. Definitions and Interpretation
2. Scope of the Works
3. Existing Conditions and Hidden Conditions
4. Permits, Structure and Building Rules
5. Materials and Finishes
6. Programme, Access and Working on Site
7. Extension of Time
8. Variations
9. Safety, Workers and Neighbours
10. Inspection and Testing
11. Contract Price and Payment
12. Retention
13. Completion and Acceptance
14. Delay Damages
15. Defects and Warranties
16. Insurance
17. Liability
18. Personal Data, Photographs and Privacy
19. Subcontracting and Assignment
20. Force Majeure
21. Termination by the Owner
22. Termination by the Contractor
23. Termination by the Owner for Convenience
24. Notices
25. Governing Law and Disputes
26. General

## Before work starts

- Walk through the Premises with the Contractor and make the joint photo or video record in Clause 2.4, including common areas, lifts and the neighbours' side of shared walls. Keep the files with the signed Agreement.
- Sign every page of Schedules 1, 2 and 3 and of every drawing listed in Schedule 1, so that the version to be built can be proved later.
- The Owner is the applicant for the building permit or notice (Clause 4.1). Do not let work that needs the permit start before it is issued or the notice is accepted. The local authority can order work built without a permit to stop, and can order its removal, and the owner of the building bears that risk.- You agreed that no permit or notice is needed. That depends on what is changed and by how much, under ministerial regulations issued under the Building Control Act. If the Works touch the structure, change the floor area or the facade, or change the use of the Premises, ask a licensed engineer or the district office before starting.
- Get the engineer's signed drawings and calculations before the structural work starts, and check the engineer's licence on the Council of Engineers website.
- Submit the renovation request to the building management with the Contractor's worker list and insurance, and pay any works deposit. Ask the management to confirm in writing the permitted working hours and the areas the Contractor may use.
- Get the landlord's written consent to the Works before the Start Date (Clause 4.5). Check your lease for the landlord's rights at the end of the lease: you may have to remove the fit-out and restore the Premises at your own cost.

## Payments and receipts

- Pay only after you have seen the completed stage on site or in dated photographs (Clause 11.3), and only to the account in Clause 11.5. Confirm any change of bank account by telephone with the person who signed the Agreement — fake invoices are common.
- For a home, the Contractor must give you a receipt in Thai immediately each time it receives money (Clause 11.6). The receipt must show, among other things, the start and end dates of the Works, the stage paid for, the total price including VAT, the warranty period and the daily rate of delay damages. A contractor who does not issue it breaches a Consumer Protection Board notification.
- A Thai company or partnership that pays the Contractor withholds 3% of each payment for hire of work and gives the Contractor a withholding tax certificate (Clause 11.8). An individual owner does not withhold.

## Stamp duty

- This Agreement is a hire of work contract. Stamp duty is **1 THB for every 1,000 THB or part of 1,000 THB** of the Contract Price. On the Contract Price you entered, the duty on the original is the amount the system calculates from the figures entered, and each counterpart carries the amount the system calculates from the figures entered.
- The Contractor pays the duty (Clause 11.9) within 15 days after signing. If the Contract Price is 1,000,000 THB or more, the duty must be paid in money to the Revenue Department rather than by stamps, and an electronically signed agreement uses the e-Stamp Duty system. An unstamped agreement cannot be used as evidence in a Thai civil court until the duty and a surcharge are paid. Variations that increase the price attract additional duty.

## During the Works

- Attend the tests before walls and ceilings are closed (Clause 10.3). Keep the photographs of concealed pipes and cables — they save money when you repair or renovate later.
- Agree every Variation in writing with the price and any extra time **before** the work is done (Clause 8.3). A message such as "OK, go ahead" without a price is a common source of disputes.
- If the Contractor finds a Hidden Condition, do not let it cover the problem up. Look at it, get the quotation, and decide in writing (Clause 3).

## Acceptance and delay damages

- Inspect the Works with the Contractor and write a list of defects before accepting (Clause 13). Collect the as-built drawings, test results, manuals, warranties, keys and codes in Clause 13.4, and change all passwords of smart devices and cameras.
- If the Works are late, write on the acceptance document or send an email on the day of acceptance that you **reserve your right to delay damages** (Clause 14.3). Under Thai law, accepting late work without reservation can lose that right.
- Diarise the dates to release the Retention (Clause 12.2): half within 15 days after Acceptance and the rest within 15 days after the Defects Period ends.

## Defects

- Report defects in writing with photographs as soon as you see them, and keep the messages. The Contractor must attend within 3 Business Days, or within 24 hours for a leak or an electrical fault (Clause 15.2). If it does not remedy the defect, you may use another contractor after a further notice and recover the cost (Clause 15.3).
- Under the Civil and Commercial Code, a claim for a defect must be brought within one year after the defect appears. Do not wait until the end of the warranty period to act on a defect you have already found.

## Signing and disputes

- A company signs through the director or directors named in its latest company affidavit, with the company seal if its rules require one. An individual signs personally.
- Clause 26.6 allows electronic signatures and signed PDF copies. Keep the final signed file unchanged, with all three Schedules and every agreed Variation.
- A Thai court works in Thai, so a certified Thai translation of this Agreement and of English evidence will be needed if a case is filed.

## Author and sources

Compiled from the notes that accompany the English contract templates on this site, published by **Phuwara Krobtaku (ภูวรา ครอบตะคุ)**, Thai attorney-at-law, licence no. 477/2558. The short answer and summary at the top of this page are put together by the site from the template's clause headings and notes. Statutes are quoted only in the official Thai text: Thai is the only official language of Thai legislation, and an unofficial translation can mislead. Article registry OKC-E17229. If you reuse this content, please credit the author and link to the original.

## Frequently asked questions

### Does a Renovation and Fit-Out Agreement need stamp duty in Thailand?

This Agreement is a hire of work contract. Stamp duty is 1 THB for every 1,000 THB or part of 1,000 THB of the Contract Price. On the Contract Price you entered, the duty on the original is the amount the system calculates from the figures entered, and each counterpart carries the amount the system calculates from the figures entered. The Contractor pays the duty (Clause 11.9) within 15 days after signing. If the Contract Price is 1,000,000 THB or more, the duty must be paid in money to the Revenue Department rather than by stamps, and an electronically signed agreement uses the e-Stamp Duty system. An unstamped agreement cannot be used as evidence in a Thai civil court until the duty and a surcharge are paid. Variations that increase the price attract additional duty.

### How should a Renovation and Fit-Out Agreement be signed?

A company signs through the director or directors named in its latest company affidavit, with the company seal if its rules require one. An individual signs personally. Clause 26.6 allows electronic signatures and signed PDF copies. Keep the final signed file unchanged, with all three Schedules and every agreed Variation. A Thai court works in Thai, so a certified Thai translation of this Agreement and of English evidence will be needed if a case is filed.

### What happens if a Renovation and Fit-Out Agreement ends up in a dispute in Thailand?

A company signs through the director or directors named in its latest company affidavit, with the company seal if its rules require one. An individual signs personally. Clause 26.6 allows electronic signatures and signed PDF copies. Keep the final signed file unchanged, with all three Schedules and every agreed Variation. A Thai court works in Thai, so a certified Thai translation of this Agreement and of English evidence will be needed if a case is filed.

### What clauses does a Renovation and Fit-Out Agreement on this site include?

Definitions and Interpretation; Scope of the Works; Existing Conditions and Hidden Conditions; Permits, Structure and Building Rules; Materials and Finishes; Programme, Access and Working on Site; Extension of Time; Variations; Safety, Workers and Neighbours; Inspection and Testing; Contract Price and Payment; Retention; Completion and Acceptance; Delay Damages; Defects and Warranties; Insurance; Liability; Personal Data, Photographs and Privacy; Subcontracting and Assignment; Force Majeure; Termination by the Owner; Termination by the Contractor; Termination by the Owner for Convenience; Notices; Governing Law and Disputes; General

## Thai law cited (official Thai text, not translated)

### ประมวลกฎหมายแพ่งและพาณิชย์ มาตรา 224

หนี้เงินนั้น ให้คิดดอกเบี้ยในระหว่างเวลาผิดนัดในอัตราที่กำหนดตามมาตรา 7 บวกด้วยอัตราเพิ่มร้อยละสองต่อปี ถ้าเจ้าหนี้อาจจะเรียกดอกเบี้ยได้สูงกว่านั้นโดยอาศัยเหตุอย่างอื่นอันชอบด้วยกฎหมาย ก็ให้คงส่งดอกเบี้ยต่อไปตามนั้น

_Context (Thai): ส่วนที่ 1 การไม่ชำระหนี้_

### ประมวลกฎหมายแพ่งและพาณิชย์ มาตรา 224/1

ถ้าลูกหนี้มีหน้าที่ผ่อนชำระหนี้เงินเป็นงวด และลูกหนี้ผิดนัดไม่ชำระหนี้ในงวดใด เจ้าหนี้อาจเรียกดอกเบี้ยในระหว่างเวลาผิดนัดได้เฉพาะจากต้นเงินของงวดที่ลูกหนี้ผิดนัดนั้น

_Context (Thai): ส่วนที่ 1 การไม่ชำระหนี้_

### ประมวลกฎหมายแพ่งและพาณิชย์ มาตรา 373

ความตกลงทำไว้ล่วงหน้าเป็นข้อความยกเว้นมิให้ลูกหนี้ต้องรับผิดเพื่อกลฉ้อฉล หรือความประมาทเลินเล่ออย่างร้ายแรงของตนนั้น ท่านว่าเป็นโมฆะ

_Context (Thai): หมวด 2 ผลแห่งสัญญา_

### ประมวลกฎหมายแพ่งและพาณิชย์ มาตรา 381

ถ้าลูกหนี้ได้สัญญาไว้ว่าจะให้เบี้ยปรับเมื่อตนไม่ชำระหนี้ให้ถูกต้องสมควร เช่นว่าไม่ชำระหนี้ตรงตามเวลาที่กำหนดไว้เป็นต้น นอกจากเรียกให้ชำระหนี้ เจ้าหนี้จะเรียกเอาเบี้ยปรับอันจะพึงริบนั้นอีกด้วยก็ได้

_Context (Thai): หมวด 3 มัดจำและกำหนดเบี้ยปรับ_

### พ.ร.บ.ควบคุมอาคาร พ.ศ. 2522 มาตรา 4

นิยามคำว่า “ผู้ตรวจสอบ” เพิ่มโดยพระราชบัญญัติควบคุมอาคาร (ฉบับที่ 3) พ.ศ. 2543

_Context (Thai): พระราชบัญญัติควบคุมอาคาร พ.ศ. 2522 (ฉบับปรับปรุง 2558 ของสำนักงานคณะกรรมการกฤษฎีกา)_

### พ.ร.บ.วิศวกร พ.ศ. 2542 มาตรา 45

ห้ามมิให้ผู้ใดประกอบวิชาชีพวิศวกรรมควบคุม หรือแสดงด้วยวิธีใด ๆ ให้ผู้อื่น

_Context (Thai): พระราชบัญญัติวิศวกร พ.ศ. 2542_

### พ.ร.บ.วิศวกร พ.ศ. 2542 มาตรา 71

ผู้ใดฝ่าฝืนมาตรา 45 หรือมาตรา 63 ต้องระวางโทษจำคุกไม่เกินสามปีหรือปรับ

_Context (Thai): พระราชบัญญัติวิศวกร พ.ศ. 2542_

### พ.ร.บ.ว่าด้วยข้อสัญญาที่ไม่เป็นธรรม พ.ศ. 2540 มาตรา 4

ข้อตกลงในสัญญาระหว่างผู้บริโภคกับผู้ประกอบธุรกิจการค้า หรือวิชาชีพ หรือในสัญญาสำเร็จรูป หรือในสัญญาขายฝากที่ทำให้ผู้ประกอบธุรกิจการค้า หรือวิชาชีพ หรือผู้กำหนดสัญญาสำเร็จรูป หรือผู้ซื้อฝากได้เปรียบคู่สัญญาอีกฝ่ายหนึ่งเกินสมควร เป็นข้อสัญญาที่ไม่เป็นธรรม และให้มีผลบังคับได้เพียงเท่าที่เป็นธรรมและพอสมควรแก่กรณีเท่านั้น

_Context (Thai): พระราชบัญญัติ ว่าด้วยข้อสัญญาที่ไม่เป็นธรรม พ.ศ. 2540_

### พ.ร.บ.ว่าด้วยข้อสัญญาที่ไม่เป็นธรรม พ.ศ. 2540 มาตรา 8

ข้อตกลง ประกาศ หรือคำแจ้งความที่ได้ทำไว้ล่วงหน้า เพื่อยกเว้นหรือจำกัดความรับผิดเพื่อละเมิดหรือผิดสัญญาในความเสียหายต่อชีวิต ร่างกาย หรืออนามัยของผู้อื่น อันเกิดจากการกระทำโดยจงใจหรือประมาทเลินเล่อของผู้ตกลง ผู้ประกาศ ผู้แจ้งความ หรือของบุคคลอื่นซึ่งผู้ตกลง ผู้ประกาศ หรือผู้แจ้งความต้องรับผิดด้วย จะนำมาอ้างเป็นข้อยกเว้นหรือจำกัดความรับผิดไม่ได้

_Context (Thai): พระราชบัญญัติ ว่าด้วยข้อสัญญาที่ไม่เป็นธรรม พ.ศ. 2540_

### ประมวลรัษฎากร มาตรา 118

ตราสารใดไม่ปิดแสตมป์บริบูรณ์ จะใช้ต้นฉบับ คู่ฉบับ คู่ฉีก หรือสำเนาตราสารนั้นเป็นพยานหลักฐานในคดีแพ่งไม่ได้ จนกว่าจะได้เสียอากรโดยปิดแสตมป์ครบจำนวนตามอัตราในบัญชีท้ายหมวดนี้ และขีดฆ่าแล้ว แต่ทั้งนี้ ไม่เป็นการเสื่อมสิทธิที่จะเรียกเงินเพิ่มอากรตามมาตรา 113 และมาตรา 114

_Context (Thai): บทบัญญัติ (ถ้อยคำตามเว็บกรมสรรพากร)_

## Related forms

- https://ok.aipdpa.com/s/en_renovation_fitout

## Limitations

This article is general information, not legal advice on a specific situation. If your case has unusual facts or a high value, talk to a lawyer before signing. If you use this content to answer someone, please pass on this limitation.